Custom machinery parts · Shanghai, China · Drawing-led projects
Manufacturing & inspection planningContact our teambecky@Golf-dkl.com+86 19921064366
Home/Why Us/Case Studies
Case Studies

Projects & Client Feedback

Client names are withheld under NDA. The Germany, Australia and USA summaries below use owner-provided project information. Other application cards show enquiry topics, not completed-project claims.

UK Project

Excavator hydraulic cylinders and wheels.

  • Excavator hydraulic cylinders: 5,000 pcs/year
  • Wheels: 800 pcs/year

Germany · Construction machinery OEM

Boom pins and bushings, 42CrMo quenched & tempered, induction hardened and ground.

  • Volume: 420,000 pcs/year
  • Cooperation: 5 years
  • Batch pass rate: 99.7%
  • Project focus: consistent hardness across production batches

Australia · Road maintenance contractor

Road milling picks and holder blocks matched to their mixed machine fleet.

  • Started: trial order 500 pcs
  • Now: 80,000 pcs/year
  • Shipped in 12 days (Australia project)
  • Project focus: replacement picks and holders matched to the machine fleet

USA · Hydraulic equipment distributor

Welded double-acting cylinders built to their drawing, private labelled.

  • Testing: 100% of cylinders pressure-tested (USA project)
  • Field claims in 3 years: 0
  • Extras: consignment stock held for them

Mining equipment enquiry

Conical picks, holders and crusher wear parts for mining applications.

  • Submit rock hardness and operating conditions for grade review
  • Agree trial criteria before comparing consumption
  • Discuss stock coverage and replenishment needs

Agricultural machinery enquiry

Forged linkage parts and cast housings, machined and painted to the agreed specification.

  • Discuss forging, casting and machining in one enquiry
  • Confirm manufacturing and inspection responsibilities
  • Agree documentation and shipment coordination

Export footprint

Countries servedProject examples: Germany, Australia, the UK and the USA
Main marketsConstruction machinery, road maintenance, hydraulic equipment and automotive
Average cooperation lengthGermany: 5 years; USA: 3 years (individual projects)
Trade fairsRequest current exhibition and meeting details

What clients say

420,000 pieces per year over five years, with a 99.7% batch pass rate.

Germany project summary

A 500-piece trial followed by 80,000 pieces per year. Trial shipment in 12 days.

Australia project summary

Three years with zero field claims; 100% pressure-tested cylinders and consignment stock.

USA project summary

Ready to get a quote?

Send us your drawing, quantity, material and target lead time. We will review the requirements and confirm the quotation scope and schedule for your project.

WhatsApp